Construction of high-durability PSC – I Girder Bridge spanning the downstream discharge zone of Manchanabele Dam. The engineering scope encompasses deep foundation piling, piers and pier caps, pre-stressed concrete I-girder casting and heavy crane launching, deck slab concreting, crash barriers, and engineered approach roads tailored to withstand heavy seasonal reservoir spillway discharges.
Executed Under High-Tolerance EPC Standards
Project Overview & Technical Scope
Engineering Highlights & Capabilities Mobilized
Hydrologically engineered for high-velocity dam spillway discharge.
Pre-stressed Concrete (PSC-I) Girder design ensuring superior load capacity.
Executed on Turnkey EPC and Back-to-Back subcontracting framework.
Zero lost-time injuries achieved across all construction phases.
Infrastructure & Execution Photo Gallery