Major canal rejuvenation work including complete reconstruction of Left Bank Canal (LBC) and Right Bank Canal (RBC). Encompassed desilting, geometric canal reprofiling, bed lining with high-strength concrete, automated regulatory escape gates, and feeder branch flumes ensuring enhanced irrigation water delivery across Mandya district.
Executed Under High-Tolerance EPC Standards
Project Overview & Technical Scope
Engineering Highlights & Capabilities Mobilized
Total desilting and concrete slip-form lining of Left & Right Bank Canals.
Eliminated transmission seepage losses, optimizing irrigation discharge.
Executed during scheduled dry-canal shutdown window with 24/7 crews.
Commissioned successfully to Karnataka Water Resources Department.